+61 (0)423 112472

Rig Placement Site Survey

Jan 01, 2017 aquares and geotechnical studies GT3 Themes 2 Months Spent

This project was a rig placement survey off Kassab in Oman, to meet operational and insurance requirements. The client required a geophysical survey of the proposed rig location including, Side Scan, Sub Bottom profiling (Pinger and Boomer), and Single Beam, all run simultaneously. Water column profiling was also undertaken.