+61 (0)423 112472

Botany Bay, NSW

Jan 01, 2007 aquares and geotechnical studies GT3 Themes 2 Months Spent

Port Botany expansion pre- tender evaluation survey, 2007.

In order to respond to a dredge tender regarding the expansion of Port Botany, Van Oord Marine Contractors decided to carry out an Aquares resistivity survey in the area. A 3D resistivity model of the survey area clearly outlined different geological structures including harder and softer sediments.

A snippet of data from the survey; loose sediment, peat and clay units can all be clearly distinguished